Abstract
This work focuses on the strategic management of mechanical engineering projects in Ecuador when no physical infrastructure is available, a situation that in practice is becoming increasingly common due to the high costs of maintaining facilities and the constant need to adapt to dynamic environments. The purpose was to propose and validate a model that allows projects to be carried out through external alliances, in such a way that efficiency, quality, and sustainability of results are ensured. To achieve this objective, a quantitative approach was applied with a non-experimental and cross-sectional design, using structured surveys administered to engineering professionals and SMEs in the sector. The questionnaire consisted of 20 Likert-scale questions, and the data processed in SPSS confirmed the reliability of the instrument; in addition, Spearman’s correlation determined a positive and significant relationship. Based on these results, a management model was proposed, composed of six components and seven stages, and supported by the principles of flexibility, sustainability, trust, and innovation. In conclusion, the study demonstrates that, the lack of physical infrastructure can be understood as an opportunity to rethink project management in Ecuador through the use of external alliances.
References
AlChaer, A. (2020). Standardized benchmarking systems for productivity in engineering projects. Journal of Construction Engineering and Management, 146(12). https://doi.org/10.1061/(ASCE)CO.1943-7862.0001875
Arjonilla Domínguez, S. J., & Medina Garrido, J. A. (2005). La empresa virtual. Dirección y Organización, 31, 16–28. https://doi.org/10.37610/dyo.v0i31.106
Ariza, E. (2017). Evaluación del éxito en proyectos: Más allá de la triple restricción. Obras y Proyectos, 22, 75–84. https://doi.org/10.4067/S0718-28132017000200075
Brito Laredo, C., Ramírez, J., & López, F. (2022). Las reformas al outsourcing en México: Implicaciones en la sostenibilidad de las alianzas. Revista Mexicana de Ciencias Políticas y Sociales, 67(246), 289–314. https://doi.org/10.22201/fcpys.2448492xe.2022.246.80521
Creswell, J. W., & Creswell, J. D. (2018). Research design: Qualitative, quantitative, and mixed methods approaches. SAGE.
Crisóstomo, A., Concha, J., & Herrera, R. (2018). Metodología de toma de decisiones para la selección de subcontratos en la industria de la construcción. Obras y Proyectos, 23, 28–39. https://doi.org/10.4067/S0718-28132018000200028
Cruz Villazón, C., Sastoque Pinilla, L., Otegi Olaso, J. R., Toledo Gandarias, N., & López de Lacalle, N. (2020). Identification of key performance indicators in project-based organisations through the lean approach. Sustainability, 12(15). https://doi.org/10.3390/su12155977
Garzón-Posada, M., Jiménez-Ramírez, M., & Gómez-Campos, R. (2022). Redes de colaboración empresarial y competitividad de las pymes: Un análisis en América Latina. Revista Facultad de Ciencias Económicas, 30(1), 43–57. https://doi.org/10.18359/rfce.5871
Hernández Sampieri, R., & Mendoza Torres, C. P. (2018). Metodología de la investigación: Las rutas cuantitativa, cualitativa y mixta. McGraw-Hill.
Hirs, J., & Vargas, J. (2023). Prioridades de digitalización en América Latina y el Caribe. Banco Interamericano de Desarrollo. https://doi.org/10.18235/0005166
Kaplan, R. S., & Norton, D. P. (1996). The balanced scorecard: Translating strategy into action. Harvard Business School Press.
Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons.
Leong, T. K., Zakuan, N., Saman, M. Z. M., & Ariff, M. S. M. (2014). Quality management systems and performance in construction projects. Procedia - Social and Behavioral Sciences, 129, 64–71. https://doi.org/10.1016/j.sbspro.2014.10.367
León-Duarte, D., Espitia-Cabrera, C., & García-Gómez, J. (2020). Ventajas del uso de sistemas de trazabilidad electrónica en procesos de manufactura. Información Tecnológica, 31(1), 237–248. https://doi.org/10.4067/S0718-07642020000100237
Meredith, J. R., & Shafer, S. M. (2019). Operations management for MBAs. John Wiley & Sons.
Mintzberg, H. (2009). Managing. Berrett-Koehler.
Nunnally, J. C., & Bernstein, I. H. (1994). Psychometric theory. McGraw-Hill.
Ortiz-Clavijo, L. F., Fernández-Ledesma, J. D., Cadavid-Nieto, S., & Gallego-Duque, C. J. (2018). Computación en la nube: Estudio de herramientas orientadas a la Industria 4.0. Lámpsakos, 20, 6–13. https://doi.org/10.21501/21454086.2560
Otzen, T., & Manterola, C. (2017). Técnicas de muestreo sobre una población a estudio. International Journal of Morphology, 35(1), 227–232. https://doi.org/10.4067/S0717-95022017000100037
Pozo-Benites, C., Córdova-Santamaría, J., & Viteri, P. (2025). Barreras y oportunidades de digitalización en pymes latinoamericanas. Management Latin American Journal, 3(2), 1–15. https://doi.org/10.62131/MLAJ-V3-N2-015
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK® guide). Project Management Institute.
Zheng, G. (2019). Leading indicators in project performance measurement. Frontiers of Engineering Management, 6(4), 493–503. https://doi.org/10.1007/s42524-019-0046-2

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright (c) 2026 Diego Patricio Togra Cáceres, Diego Marcelo Cordero Guzman, Jorge Ormaza Andrade